Stormwater storage under construction for the Al Haramain project
|
The Hydro storage block offered significant advantages over other underground storage options considered for the project because of its perforated distribution pipes. The technology is designed to prevent sediments suspended in the stormwater from entering the storage tank and instead wash them through the pipe network. This means the storage tank is effectively self-cleansing and requires minimal maintenance.
Due to the unique sizing capabilities of Hydro-Brake Optimum, engineers were also able to minimize the storage area required on site, thus providing savings on construction costs. Construction of the 449.2-km high-speed Al Haramain railway began in 2009 to link the cities of Medina and Mecca via King Abdullah Economic City, Rabigh, Jeddah, and King Abdulaziz International Airport.
See also:
"Innovative online sizing calculator for stormwater treatment launched"
"Hydro International earns Exporter of the Year Award for South American growth"
About Hydro International
Hydro International, which has offices in the UK, USA and Ireland, provides cost‑effective solutions for controlling the quantity and improving the quality of water with minimal maintenance. Hydro products have won international awards for outstanding contributions and technical innovation in the water industry. Hydro operates in the water and wastewater sector and the stormwater sector for the construction industry and, offers an enhanced coverage of treatment solutions to the municipal sector. For more information, visit www.hydro-int.com/us.
###