The Pittsburgh Water and Sewer Authority shared that its seventh consecutive round of testing finds roughly 3.5 parts per billion of lead in drinking water samples.
The Regional Surface Water Supply Project treats surface water from the Tuolumne to produce 15 MGS of drinking water for the cities of Ceres and Turlock.
Chlorine measurement has been around since the early 1900s when chlorine disinfection was introduced to disinfect water sources, a vital part of the treatment process. WaterWorld...
Submission by Caroline MeissEdited by Mandy CrispinSpartanburg Water is one of the most established water systems in South Carolina. Created in 1929 as the Spartanburg Metropolitan...
Submission by Caroline MeissEdited by Mandy CrispinThe largest capital improvement project for McCormick Commission of Public Works CPW), the new 3.7MGD water treatment plant,...
Submission by Caroline MeissEdited by Mandy Crispin“The Lake Greenwood WTP and Raw Water Intake is a unique Greenfield facility that exemplifies the tremendous synergy that the...