Perihelion completes SWPPP, receives construction permit at Utah gold mine

April 4, 2008
Perihelion Global has completed the required comprehensive Storm Water Pollution Prevention Plan (SWPPP) and filed for and received a Storm Water Construction Permit for use at its Patented Gold mine near the Utah/Nevada border. State of Utah regulations require construction activity that will disturb one or more acres of land to develop a comprehensive SWPPP and obtain a Storm Water Permit before commencing operations. The permit is based on EPA regulations designed to control stormwater...

WILMINGTON, DE and SANTA ROSA BEACH, FL, March 27, 2008 -- Perihelion Global, a development company with interests in natural resources, alternative energies, and advanced communications, has announced that the Company has completed the required comprehensive Storm Water Pollution Prevention Plan (SWPPP) and filed for and received a Storm Water Construction Permit for use at its Patented Gold mine near the Utah/Nevada border.

State of Utah regulations require construction activity that will disturb one or more acres of land to develop a comprehensive Storm Water Pollution Prevention Plan (SWPPP) and obtain a Storm Water Permit before commencing operations. The permit is based on EPA regulations designed to control storm water and to reduce the amount of pollutants entering rivers, lakes, and streams.

With this additional permit, the Company is permitted to begin installing equipment and preparing the designated mining area for commencement of mining operations. The Company acquired the Storm Water Permit in addition to permits received for Small Mining Operations (State of Utah, received April 2007), Small Mine Reclamation (State of Utah, received April 2007), Right of Way Grant Over Federal Land (US Dept. of Interior-BLM, received June 2007), and Amended Small Mining Operations (State of Utah, received October 2007).

The Patented Gold Mine is located at high elevation and has been affected by above average seasonal snowfall limiting access during the past winter months. With spring approaching and temperatures rising, the Company anticipates resuming work at the mine to prepare for operations under the Storm Water Permit. The Company completed construction of an approximate 8,000 ft roadway over Federal Lands after receiving the Right of Way Grant from the US Dept. of Interior, Bureau of Land Management last year to allow for transportation to and from the mine over Federal Land. Successful development of the Patented Gold Mine remains a primary business objective for the Company, and management continues to believe the financial climate for metals prices will remain attractive through the development of this property.

The Company will apprise shareholders of relevant progress achieved at the Patented Mine site.

Perihelion Global focuses on the acquisition, development and management of technologies, strategic commodity reserves and assets in the energy, natural resource and communications markets.

###

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track