Research control valves

Dec. 23, 2015
Research control valves

Badger Meter has established a new lead time of two weeks for Research Control® Valves (RCV) within its broad standard offering - a reduction of more than 50%. For many years, lead times for RCV valve products ranged from four to six weeks. Over the past year, Badger has made a number of major customer-focused investments, where it has optimized its inventory, enhanced its machining capability, improved its system infrastructure, and increased its staff to ensure a new two-week standard lead time.

Badger Meter

www.badgermeter.com

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track